The range
Ask the assistant at the bottom right for variants, colours and current pricing.
e.MAS 7
Three variants: Prime, Premium and Premium Plus.
e.MAS 5
Two variants: Prime and Premium.
Charging
CCS2. DC 30–80% in about 20 minutes; AC home wallbox overnight.
Warranty
Vehicle and battery cover — ask for the current terms.
Financing
Hire purchase, deposits and typical waiting times.
East Malaysia
Pricing, charging and service in Sabah and Sarawak.
Running cost, roughly
Home charging, per 100 km. Public charging costs more.
| Sarawak | ~RM5 / 100 km |
|---|---|
| Peninsular Malaysia | ~RM7–8 / 100 km |
| Sabah | ~RM8.50 / 100 km |
| DC fast charge, 30–80% | ~20 minutes |
Try the assistant
Click a question to copy it, then press Chat with us at the bottom right and paste it in.
The last one is in Bahasa Malaysia on an English knowledge base — the assistant should still answer it. Try an off-topic question too, and watch it decline rather than invent.